Daventry Enabling works

Client: Ford Motor Company
Contract Period: 10 weeks

  • pic
  • pic

A fast track project, Wilson Construction were responsible for the complete strip out of a redundant warehouse. The reason for the strip out was due to the buildings condition and the amount of asbestos it contained. Works were completed carefully to ensure the main steel frame was left in a condition that could be reused. Additional works included the diversion of the existing storm water system and the installation of a new foul system.