DEP road repairs
Client: Ford Motor Company
Contract: Period: 20 weeks
Value: £750,000
The contract consisted of various road repairs to the Ford Motor company Dagenham estate. Many of the areas required full road construction, the existing surface and sub-base were removed and reconstructed.
We were responsible for surveying the existing surfaces and designing new levels to ensure surface water was cleared quickly, Local drainage systems were surveyed and cleaned and if required repaired. Existing kerb lines were also surveyed and where required new kerbs laid.
It was paramount to maintain the traffic flowing throughout the contract, traffic management plans were carefully planned and implemented. Some areas were completed out of hours to reduce disruption to the estate operations.