Trans-shipping Warehouse
Client: Ford Motor Company
Contract: Period: 6 weeks
Value: £150,000
The Construction of a New steel framed warehouse.
Incorporating the demolition and removal of the existing shed, Striping of the existing Tarmac surface for recycling, Piling reinforced pile caps and ground beam foundations, Forming of a concrete landing leg strip and lorry stops, Erection of fabricated steel frame and cladding, Heavy duty block paving, Installation of internal and external lighting and services.